FLOORMATE 500 PDF

Page 5: Assembly Handle Assembly Assemble handle Rotate bottom handle support A up to the upright position until a snap is felt. Align control rod B on upper han- dle C with slot in bottom handle support D. Push upper handle C down until it is snapped in place. Install brushes and nozzle To install brushes, place handle in upright position.

Author:Kazrarg Maull
Country:Ecuador
Language:English (Spanish)
Genre:Software
Published (Last):13 September 2016
Pages:75
PDF File Size:13.29 Mb
ePub File Size:1.8 Mb
ISBN:214-2-12981-784-7
Downloads:76878
Price:Free* [*Free Regsitration Required]
Uploader:Meztimuro



In this case the framework of the reinforced concrete floor structure can be assembled on top of the thermal insulation, or even the insulation of the building against soil moisture can be prepared here. Using this method, a layer of blind concrete can be saved, including all of its incremental costs. SIZING To determine the load-bearing capacity of floor structures also incorporating a thermal insulation layer for permanent and useful loads, the compressive strength values for permanent load must be used!

For the planning of reinforcement steel requirements of a floor slab working as a load-distribution structure over the thermal insulation layer, a structural engineer must be involved! Between the thermal insulation and the concrete screed layers, the placement of a PE film separating and sliding layer is recommended.

In slabs between levels, impact sound insulation must be resolved separately. The thermal insulation boards can be laid down simply and fast in any weather conditions. The boards can be cut to size by a handsaw or hot wire cutter.

The cut surfaces can be accurately fitted. Rebar installation Thanks to the high strength, the spacers of the iron reinforcement will not penetrate into the thermal insulation boards, so the necessary clear concrete cover will be ensured everywhere. However, in the course of the fitting work, it is reasonable to walk on the thermal insulation or use load-distribution planks or flooring boards on the area already fitted.

Where the thermal insulation boards are installed above the insulation against soil moisture or ground water, they will also act as a mechanical protective layer during the time of construction, which is particularly favourable during rebar installation. At higher temperatures, the plates will melt and suffer permanent deformation. Certain organic materials, such as solvent-based wood preservatives, paint additives, solvents acetone, ethyl acetate, kerosene, gasoline etc.

For gluing, solvent-free adhesives must be used. XPS products must not be exposed to permanent intensive direct sunlight.

EL LENGUAJE DE LA VISION GYORGY KEPES PDF

FloorMate® Cleaners

.

LUIS PENAGOS GRAMATICA LATINA PDF

Hoover FloorMate SpinScrub 500 Owner's Manual

.

CHURCHER BEGINNING DATABASE DESIGN PDF

FLOORMATE 500

.

Related Articles